This is our risk assessment which highlights the risky situations we may encounter in the production of our film introduction.

Numerous risks can be pointed out during the filming of our project, these include:
1) The breaking of our sugarglass

2) Dangers of filming around river

3) Transportation of equipment to further destinations

4) Electric equipment being used outdoor

5) Possibility of it raining

We will ensure our safety and our equipments safety by doing the following things:

1) Break it in a controlled environment with no unnessesary people in the room, we will use safe surroundings that has space, also we will ensure that our broken sugar glass can easily be cleared up.

2) We will film the water sequence with a reasonable distance between us and the water, this will prevent us slipping in or damaging equipment with water.

3) When transporting equipment we will ensure we use the appropriate carriers, for example for the cameras we will use the allocated bag that come with them, when travelling on the bus with equipment we will ensure it’s safety by keeping it at our side.

4) We will ensure all wires are tooked away and any lighting will be switched off when not in use at the mains.

5) We will check the weather forcast before setting out to film and also make sure we have waterproof carriers with us, so we can store the equipment if it does start to rain.